Fuel


Virginia Uranium’s new owner hopes to wait out mining moratorium

November 21, 2022, 12:00PMNuclear News
Coles Hill property location. (Image: Consolidated Uranium)

Consolidated Uranium plans to acquire Virginia Energy Resources, which owns Virginia Uranium and the Coles Hill Uranium Project, an undeveloped uranium deposit that sits under about 3,000 acres of land in south central Virginia. The state’s General Assembly has maintained a moratorium on uranium mining since 1982 that was upheld in the courts as recently as 2020, but Consolidated Uranium sees reason for “confidence that the moratorium on developing uranium projects in the state may ultimately be overcome,” and appears content to settle in for a wait.

Centrus Energy gets more time and money to complete HALEU demo

November 15, 2022, 12:08PMNuclear News
Centrifuge casings arrive in Piketon, Ohio. (Photo: Centrus Energy)

The Department of Energy announced a cost-shared award on November 10 valued at about $150 million for American Centrifuge Operating, a subsidiary of Centrus Energy, to complete the high-assay low-enriched uranium (HALEU) demonstration project it began in 2019. After delays that Centrus attributes in part to the COVID-19 pandemic, the company now has until the end of 2023 to produce the first 20 kilograms of HALEU enriched to 19.75 percent U-235 from the 16-centrifuge cascade it has installed in a DOE-owned Piketon, Ohio, facility—the only U.S. facility currently licensed to produce HALEU.

Framatome’s accident tolerant fuel system successfully completes second cycle at Vogtle

October 27, 2022, 12:09PMNuclear News
Framatome’s GAIA fuel assembly with Protect EATF technologies. (Photo: Framatome)

Framatome has completed the second 18-month cycle of its GAIA Protect Enhanced Accident Tolerant Fuel (EATF) technology at Vogtle’s Unit 2 in Waynesboro, Ga. Inspections afterward revealed that the full-length chromium-coated fuel rods maintained their original characteristics, while the chromia-enhanced pellets operated as designed during 36 months of reactor operation.

Just add HALEU: TerraPower and GNF-A break ground on fast reactor fuel facility

October 26, 2022, 9:21AMNuclear News
Natrium Fuel Facility groundbreaking. (Photo: GNF-A)

Global Nuclear Fuel–Americas (GNF-A) and TerraPower announced their plans to build a Natrium fuel fabrication facility next to GNF-A’s existing fuel plant near Wilmington, N.C, on October 21. While more than 50 years of fuel fabrication at the site have supported the boiling water reactor designs of GE (GNF-A’s majority owner) and GE Hitachi Nuclear Energy (GEH), the Natrium Fuel Facility will produce metallic high-assay low-enriched uranium (HALEU) fuel for the sodium fast reactor—Natrium—that TerraPower is developing with GEH.

DOE plans offtake contracts to stock a HALEU bank “as soon as possible”

October 21, 2022, 9:13AMNuclear News
An image from the video “What is High-Assay Low-Enriched Uranium (HALEU)?” released by the DOE in April 2020. (Source: DOE)

Another piece of the plan for meeting the urgent need for high-assay low-enriched uranium (HALEU) to fuel advanced reactor deployments fell into place when the Department of Energy held an Industry Day on October 14. Attendees were asked how soon they could deliver 25 metric tons per year of HALEU enriched in the United States from newly mined uranium. Offtake contracts for six or more years of HALEU production at that rate could be used to stock a DOE-owned HALEU bank to “support [HALEU] availability for civilian domestic research, development, demonstration, and commercial use.”

TRISO-X breaks ground on Oak Ridge fuel facility as licensing work continues

October 17, 2022, 12:00PMNuclear News
Government officials and representatives of X-energy and its TRISO-X subsidiary at the October 13 groundbreaking. (Photo: X-energy)

Leaders of X-energy and its TRISO-X subsidiary gathered on October 13 to break ground at the site of what X-energy bills as “North America’s first commercial-scale advanced nuclear fuel facility” in Oak Ridge, Tenn. X-energy expects the TRISO-X Fuel Fabrication Facility (TF3) to create more than 400 jobs and to be commissioned and operational by 2025.

Westinghouse fuel plant okayed for four more decades of operation

September 13, 2022, 3:01PMNuclear News
An aerial view of Westinghouse’s Columbia Fuel Fabrication Facility in Hopkins, S.C. (Photo: Westinghouse)

The Nuclear Regulatory Commission yesterday announced that it has issued a renewed license for Westinghouse Electric Company’s Columbia Fuel Fabrication Facility (CFFF), authorizing operations at the plant for another 40 years—through September 12, 2062.

Located in Hopkins, S.C., the CFFF manufactures fuel rods for use in commercial nuclear reactors. According to Westinghouse, 10 percent of the nation’s electricity comes from the fuel manufactured at the facility.

Westinghouse, ENUSA partner on fuel fabrication

September 12, 2022, 12:00PMNuclear News

ENUSA’s president and CEO Mariano Moreno (left) and Westinghouse’s nuclear fuel president Tarik Choho shake hands on their latest partnership. (Photo: Westinghouse)

Westinghouse Electric Company and Madrid-based ENUSA intend to collaborate on VVER-440 fuel fabrication, the American firm announced last week at the World Nuclear Association’s World Nuclear Symposium.

The partnership, Westinghouse stated in a September 8 release, “will build on decades of performance delivering a Western alternative to Russian fuel in the European market.” There are currently 16 nuclear power reactors in Europe operating with VVER-440 fuel, and utilities in the region are actively looking for alternatives to Russian-supplied fuel for those units, according to the release.

Signers’ language: “We have a mutual interest in partnering in VVER-440 fuel manufacturing and potentially other related areas,” said Tarik Choho, Westinghouse’s president of nuclear fuel. “With our proven track record supplying for VVER reactors, we stand ready to support even greater energy security for our customers and European countries. We look forward to strengthening our partnership with ENUSA and leveraging their valuable experience in this field.”

White House would send the DOE $1.5 billion to set up reliable LEU/HALEU supply

September 8, 2022, 3:06PMNuclear News
HALEU in the form of 1.5–3 kg reguli ready for fuel fabrication. (Photo: INL)

Those who welcomed the $700 million earmarked for high-assay low-enriched uranium (HALEU) supply in the Inflation Reduction Act of 2022 (IRA) in August have cause to celebrate again. The White House sent a supplemental appropriation request to Congress on September 2 that would provide more than double the IRA funds if passed—$1.5 billion—for the Department of Energy’s Office of Nuclear Energy to build a reliable supply of both low-enriched uranium for existing U.S. nuclear power plants and HALEU for the advanced reactors that will be built within the decade.

Bipartisan bill to prioritize HALEU debuts in House

August 23, 2022, 9:30AMNuclear News

Donalds

Luria

Reps. Elaine Luria (D., Va.) and Byron Donalds (R., Fla.) have introduced in the House of Representatives the Fueling Our Nuclear Future Act (H.R. 8723), a measure to accelerate the availability of commercially produced high-assay low-enriched uranium (HALEU) fuel and boost domestic energy production in the United States.

Unveiled last week following a Senate version introduced in April by Sen. John Barrasso, the legislation directs the secretary of energy to prioritize and establish a program that ensures a domestic supply of HALEU for advanced nuclear reactors. Currently, the nation lacks the domestic enrichment capability to produce HALEU. The bill explicitly excludes uranium sourced or processed by any entity owned or controlled by the governments of Russia and China.

Ultra Safe Nuclear opens pilot-scale TRISO fuel facility in Oak Ridge

August 22, 2022, 9:30AMNuclear News
Terrani, Huff, and Fleischmann had the honor of cutting the ribbon to celebrate the opening of the Pilot Fuel Manufacturing facility. (Photo: USNC)

Ultra Safe Nuclear Corporation (USNC) celebrated the opening of its Pilot Fuel Manufacturing (PFM) facility in Oak Ridge, Tenn., on August 18 with a ribbon-cutting ceremony and tour attended by assistant secretary for nuclear energy Kathryn Huff, Tennessee lieutenant governor Randy McNally, U.S. Rep. Chuck Fleischmann (R.), representatives from the offices of Sens. Marsha Blackburn (R.) and Bill Hagerty (R.), and other distinguished guests. The next day, radiological operations began at the privately funded facility, which was designed and built in less than twelve months within an existing industrial building purchased by USNC in 2021.

Columbia fuel facility gets final EIS for 40-year renewal

August 1, 2022, 3:25PMNuclear News

The Nuclear Regulatory Commission issued its final environmental impact statement (EIS) for the proposed license renewal of Westinghouse Electric’s Columbia Fuel Fabrication Facility (CFFF) in Hopkins, S.C, on July 29, recommending renewal for a 40-year term.

Small and Advanced Reactors with Diverse Fuel Cycles Can Deliver Energy Security

July 29, 2022, 7:08AMNuclear News

Nuclear energy offers a pairing of high capacity factors and low carbon emissions unrivaled by other power sources, and advanced reactors and small modular reactors (SMRs) hold promise to deliver that power with even more efficiency and versatility. Researchers in the public and private sectors, backed by government funding through programs like the Department of Energy’s Advanced Reactor Demonstration Program and Advanced Research Projects Agency–Energy (ARPA-E), are bringing that promise closer to fulfillment by engineering solutions to open questions about advanced reactor materials and fuel cycles.

Energy Northwest, Curio partner on recycling used fuel

July 19, 2022, 3:00PMNuclear News
Energy Northwest’s Columbia Generating Station, in Richland, Wash. (Photo: Energy Northwest)

Energy Northwest, owner and operator of Columbia Generating Station in Richland, Wash., recently signed a memorandum of understanding with nuclear technology firm Curio Solutions regarding Curio’s NuCycle nuclear waste recycling process.

Columbia is the Northwest’s only operating nuclear power plant, consisting of one 1,207-MWe boiling water reactor. There are currently 54 concrete and steel casks on site, holding the spent fuel produced by the reactor since it began commercial operation in 1984.

GLE eyes earlier enrichment, inks agreements with two largest U.S. utilities

July 11, 2022, 9:30AMNuclear News

Global Laser Enrichment (GLE) signed separate, nonbinding letters of intent in June with the two largest nuclear power operators in the United States—Constellation and Duke Energy—to assess potential nuclear fuel supply chain cooperation, including support for GLE’s deployment of laser enrichment technology in the United States. According to GLE president and chief commercial officer James Dobchuk, who delivered a presentation on June 7 at the World Nuclear Fuel Market Annual Meeting, the company’s baseline deployment schedule could be accelerated by about three years (under favorable market conditions) to supply the nuclear fuel market with uranium in a range of enrichment levels in 2027.

Fast reactor technology getting renewed attention

June 7, 2022, 12:04PMANS Nuclear Cafe

Fast reactor technology, which can run on used nuclear fuel to generate energy, could fulfill U.S. energy needs for 100 years using existing waste, according to Jess Gehin, associate lab director at Idaho National Laboratory and an ANS member in a recent interview with CNBC. Gehin and other nuclear experts believe that this technology could provide substantial energy for the country, help resolve the debate over storing spent nuclear waste, and address the issue of climate change with more carbon-free energy generation. However, the commercial development of fast reactor technology has been hampered by political and economic roadblocks, which researchers are now seeking to overcome.

Australia’s Honeymoon mine to resume production

June 7, 2022, 7:56AMNuclear News
The Honeymoon uranium project in South Australia. (Photo: Boss Energy)

The board of Boss Energy Limited has made a “final investment decision” to develop the Honeymoon in situ uranium project in Australia, the Perth-based company announced last week. Boss said it will now accelerate engineering, procurement, and construction to ensure that Honeymoon—located in South Australia, near the border with New South Wales—remains on track for first production by December 2023, ramping up to a steady-state rate of 2.45 million pounds of U3O8 per year.

Westinghouse to supply all fuel for Ukraine fleet, plus more AP1000 units

June 6, 2022, 3:01PMNuclear News
A group shot of Energoatom and Westinghouse personnel at the Khmelnytskyi nuclear power plant in Ukraine, where the first two AP1000 reactors under a recent agreement will be constructed. (Photo: Westinghouse)

The war in Ukraine notwithstanding, Westinghouse Electric Company has stepped up its partnership with Energoatom, Ukraine’s state-owned nuclear utility, signing agreements last week to supply all of the nuclear fuel for the country’s operating reactor fleet and to collaborate on the construction of nine AP1000 units for Ukraine, rather than the five earlier envisioned.

Granholm: DOE developing “full-on uranium strategy”

May 10, 2022, 3:00PMNuclear News

The Department of Energy is putting together a national uranium supply strategy, energy secretary Jennifer Granholm told lawmakers last week at a Senate Energy and Natural Resources Committee hearing.

Granholm was appearing before the committee to discuss the Biden administration’s fiscal year 2023 budget proposal for the DOE.

TRISO-X applies for advanced reactor fuel facility license

April 11, 2022, 12:01PMNuclear News
Pictured from left to right: John Tappert, NRC; Jonathan Rowley, NRC; Jacob Zimmerman, NRC; Matthew Bartlett, NRC; Tim Beville, DOE; Jennifer Wheeler, TRISO-X; John Lubinski, NRC; Pete Pappano, TRISO-X; Jill Caverly, NRC; and Shana Helton, NRC. (Photo: X-energy)

TRISO-X submitted a license application for a high-assay low-enriched uranium (HALEU) fuel fabrication facility to the Nuclear Regulatory Commission on April 6, the day after parent company X-energy announced that TRISO-X had secured a 110-acre site in Oak Ridge, Tenn., for the construction of the facility, which it is aiming to have operating in 2025.