John Wagner named INL director

November 6, 2020, 9:35AMNuclear News

Wagner

John C. Wagner, ANS Fellow and member since 1991, has been named as the next director of Idaho National Laboratory, Battelle Energy Alliance (BEA) announced on Thursday. BEA manages and operates the laboratory for the Department of Energy.

Wagner will begin his new role on Dec. 11. He has been at INL since 2016 and has been an associate laboratory director for Nuclear Science and Technology since 2017.

Opinion: U.K. power stations could make hydrogen, heat homes, and decarbonize industry

November 5, 2020, 12:19PMANS Nuclear Cafe

Nuclear reactors have evolved to achieve more than just electricity generation and should be part of the U.K.’s plan to reach net-zero emissions by 2050. Photo: Royal Society, authors provided

The United Kingdom needs to start rebuilding its capacity to generate nuclear power, according to an opinion article published Wednesday on The Conversation by two members of the U.K.-based Bangor University faculty.

Bill Lee, a professor of materials in extreme environments, and Michael Rushton, a senior lecturer in nuclear energy, argue that the plan by the Committee on Climate Change, which advises the U.K. government on the effort to reach net-zero emissions by 2050, is “strangely silent on nuclear power.”

Core Power thinks nuclear will make waves in commercial shipping

November 5, 2020, 9:40AMNuclear News

Illustration of Core Power’s modular MSR concept. Image: Core Power

Core Power is a tiny startup that is bullish on the prospects for nuclear-powered ocean transportation. The company announced on November 2 that it is part of a team that has applied for a cost-shared award from the Department of Energy’s Advanced Reactor Demonstration Program (ARDP) to build a prototype molten salt reactor (MSR). Core Power believes that MSRs could be used for propulsion or electricity generation to decarbonize the world’s commercial shipping fleet.

Based in London, England, Core Power is the only non-U.S. member of the team, which includes TerraPower, Southern Company, and Orano USA. As a marine engineering firm, Core Power says that it offers its ARDP partners “access to pent-up demand from a market with real customers.” An announcement of ARDP “risk reduction for future demonstrations” award winners is expected in December.

New NNSA website helps in nuclear safeguards reporting

November 5, 2020, 6:59AMNuclear News

The National Nuclear Security Administration has launched RAINS—the Reporting Assistant for International Nuclear Safeguards website—intended to assist users with the requirements surrounding international nuclear safeguards.

Nuclear safeguards are designed to verify that all nuclear material declared by a nation-state is not diverted for non-peaceful uses; detect any misuse of declared facilities or locations outside facilities; and detect any undeclared nuclear material or activities in the nation-state.

Holtec steps up efforts for SMR design certification

November 4, 2020, 3:01PMNuclear News

Artist’s rendering of a Holtec SMR-160 plant. Image: Holtec International.

Holtec International announced yesterday a drive to secure Nuclear Regulatory Commission design certification of the company’s SMR-160 small modular reactor on an accelerated schedule.

According to the announcement, Holtec met with NRC officials and staff on September 30 to present a licensing roadmap that charts what the company referred to as a “seamless progression from [10 CFR Part 50] to [10 CFR Part 52] and a licensing topical report submittal schedule to support an accelerated availability plan for our global customers.”

The first planned submittal, scheduled to occur within the next few weeks, is a topical report covering the SMR-160’s essential safety features: the Passive Core Cooling System (PCCS) and Passive Containment Heat Removal System (PCHR). These systems, Holtec said, “undergird the SMR’s guaranteed safety under the various operational occurrences and hypothetical accidents that may afflict the plant.”

The submittal also aims to demonstrate that the PCCS and PCHR comply with the NRC’s General Design Criteria (Part 50, Appendix A), “an important enabler to expedite licensing efforts,” according to Holtec.

Nuclear tech in space: What’s on the horizon?

November 4, 2020, 12:12PMNuclear News

Illustration of a Mars transit habitat and nuclear electric propulsion system. Image: NASA

NASA aims to develop nuclear technologies for two space applications: propulsion and surface power. Both can make planned NASA missions to the moon more agile and more ambitious, and both are being developed with future crewed missions to Mars in mind. Like advanced reactors here on Earth, space nuclear technologies have an accelerated timeline for deployment in this decade.

Space nuclear propulsion and extraterrestrial surface power are getting funding and attention. New industry solicitations are expected this month, and a range of proposed reactor technologies could meet NASA’s specifications for nuclear thermal propulsion (NTP). Nuclear electric propulsion could increase the feasibility of crewed missions to Mars with a shorter transit time, a broader launch window and more flexibility to abort missions, reduced astronaut exposure to space radiation and other hazards, expanded payload mass capabilities, and reduced cost.

Belarus’s first nuclear reactor connects to grid

November 4, 2020, 6:57AMNuclear News

The Belarusian nuclear power plant. Photo: Rosatom

Belarus on November 3 became the latest nation to begin generating electricity with nuclear energy when Unit 1 of the Belarusian nuclear plant was connected to the country’s power grid.

The Belarusian construction project, located in the Grodno region of Belarus, features twin 1,109-MWe pressurized water reactors, supplied by Rosatom, Russia’s state-owned nuclear energy corporation. The units are VVER-1200 Generation III+ designs, model AES 2006. Just last week, a VVER-1200 was connected to the Russian grid at the Leningrad plant.

The start-up program for Unit 1 began on August 7, when the first fuel assembly with fresh nuclear fuel was loaded into the reactor, according to a Rosatom press release. The reactor achieved first criticality on October 11.

Once fully completed, the plant is expected to supply approximately 18 billion kWh of low-carbon electricity to the Belarus national grid every year, Rosatom said.

BBC: U.K. government may be close to greenlighting Sizewell C

November 3, 2020, 3:03PMANS Nuclear Cafe

Artist’s rendering of the Sizewell site, with Sizewell C at right. Image: EDF Energy

A BBC News story from late last week states that the U.K. government “is close to giving the green light” to EDF Energy’s proposed Sizewell C nuclear new build project in Suffolk, adding that details surrounding the project’s financing “are still being hammered out.”

The Sizewell C station, consisting of twin European pressurized reactors (EPRs), would be built next to Sizewell B, a 1,198-MWe pressurized water reactor that began operation in 1995. (The Sizewell site also houses Sizewell A, a 290-MWe Magnox gas-cooled reactor, but that unit was permanently shuttered in 2006.) Sizewell C would be a near copy of the two-unit Hinkley Point C station, currently under construction in Somerset.

GAO: Concerns persist on DOE Order 140.1

November 3, 2020, 12:00PMNuclear News

The Government Accountability Office (GAO) released a report on October 29 outlining potential issues regarding a 2018 Department of Energy order on how the department, the National Nuclear Security Administration, and their contractors interact with the Defense Nuclear Facilities Safety Board (DNFSB) and its staff. DNFSB is the independent agency responsible for ensuring that DOE facilities are protective of public health and safety.

According to the 81-page GAO report, provisions of DOE Order 140.1, issued in May 2018, restricted DNFSB’s access to information essential to its mission, and a subsequent revision of that order has not eliminated concerns that it would hinder DNFSB in carrying out its oversight responsibilities.

Fallout from Ohio’s H.B. 6 scandal reaches FirstEnergy C suite

November 3, 2020, 9:28AMNuclear News

Chuck Jones, former FirstEnergy CEO

Akron, Ohio-based FirstEnergy Corporation—former parent of Energy Harbor, the owner of Ohio’s Davis-Besse and Perry nuclear plants—announced on October 29 that it has fired its chief executive officer, Charles “Chuck” Jones, as well as its senior vice president of product development, marketing, and branding and its senior vice president of external affairs.

The actions, according to FirstEnergy, were prompted by an internal company review undertaken in response to the scandal surrounding H.B. 6—the now infamous legislation signed into law last year by Ohio Gov. Mike DeWine that includes subsidies for Davis-Besse and Perry and that is at the heart of an alleged multi-million dollar racketeering and corruption scheme aimed at guaranteeing its passage.

In the announcement, FirstEnergy said only that its review “determined that these executives violated certain FirstEnergy policies and its code of conduct.” Replacing Jones is Steven E. Strah, who had been the firm’s president.

Complaint filed with FERC to save Diablo Canyon from early closure

November 2, 2020, 3:01PMNuclear News

A nuclear advocacy group is asking the Federal Energy Regulatory Commission to review the approval by California regulators of the decision by Pacific Gas and Electric in 2016 to prematurely retire its Diablo Canyon plant—the Golden State’s only remaining operating nuclear power facility—in 2025.

On October 26, the nonprofit organization Californians for Green Nuclear Power Inc. (CGNP) filed a 32-page complaint with FERC in the matter, listing as respondents the North American Electric Reliability Corporation (NERC), Western Electricity Coordinating Council (WECC), California Independent System Operator (CAISO), California Public Utilities Commission (CPUC), California State Water Resources Control Board (CSWRCB), and California State Lands Commission (CSLC).

Versatility, leadership, and “the highest fast neutron flux in the history of ever”: Highlights from INL’s VTR webinar

November 2, 2020, 12:04PMNuclear News

Clockwise from top left are Craig Piercy, Ray Furstenau, Tom O’Connor, Sean McDeavitt, Tara Neider, and Judi Greenwald.

The Versatile Test Reactor’s conceptual design was approved in September, and a draft environmental impact statement could be released within the week. The completion of more project milestones leading to operation in 2026, however, will depend on congressional appropriations. An expert panel described the need for a state-of-the-art test reactor and the value that the VTR could bring to the U.S. nuclear R&D community over its 60-year lifetime during a recent webinar—“Advanced U.S. Nuclear Research and Development: A Briefing and Discussion on the VTR”—hosted by Idaho National Laboratory.

Craig Piercy, ANS executive director/CEO, moderated the webinar, introducing a project update from VTR executive director Kemal Pasamehmetoglu and facilitating a Q&A session with representatives of the Nuclear Regulatory Commission, the Department of Energy, universities, reactor developers, and the Nuclear Innovation Alliance. A recording of the October 29 webinar is available online. INL also has a video and information online on the VTR.

“I think that the VTR represents part of a larger effort to modernize our infrastructure, develop a new set of technologies, and really preserve our global leadership in the field,” said Piercy. Read on to learn more about the promise the VTR holds for the nuclear community.

Nuclear part of conversation at U.S.-India “2+2” talk

October 30, 2020, 11:59AMNuclear News

From left: Secretary of Defense Mark Esper and Secretary of State Mike Pompeo participate in the U.S.-India 2+2 Ministerial Dialogue plenary session with Indian Defense Minister Rajnath Singh and Indian External Affairs Minister Subrahmanyam Jaishankar in New Delhi, India, on October 27, 2020. Photo: State Department/Ron Przysucha

In New Delhi earlier this week, U.S. Secretary of State Mike Pompeo and Secretary of Defense Mark Esper joined their Indian counterparts, Minister of External Affairs Subrahmanyam Jaishankar and Minister of Defense Rajnath Singh, for the third U.S.-India 2+2 Ministerial Dialogue—a yearly confab focused on strengthening the strategic relationship between the two nations. (In February of this year, the White House elevated that relationship to Comprehensive Global Strategic Partnership status.)

The first 2+2 dialogue took place in New Delhi in September 2018, with a second held in Washington, D.C., in 2019. Washington is scheduled to host the fourth such meeting next year.

NRC gives nod to Watts Bar-2 power uprate

October 30, 2020, 9:27AMNuclear News

Watts Bar Unit 2. Photo: TVA

The Nuclear Regulatory Commission has approved a request from the Tennessee Valley Authority to increase the generating capacity of Unit 2 at the Watts Bar nuclear power plant by 1.4 percent, according to an October 27 press release from the agency. TVA submitted its application for the power uprate on October 10, 2019, and the NRC issued the required license amendment on October 21.

The power uprate, which TVA intends to implement by mid-December, will increase Unit 2’s generating capacity from approximately 1,223 MWe to 1,240 MWe.

“The NRC staff determined that TVA could safely increase the reactor’s output, primarily through more accurate means of measuring feedwater flow,” the press release stated, adding, “NRC staff also reviewed the TVA evaluations demonstrating that the plant’s design can safely handle the increased power level.”

New unit delivers first electricity to Russian grid

October 30, 2020, 7:02AMNuclear News

Rosenergoatom, the electric power division of Russia’s state-owned nuclear power corporation Rosatom, announced on October 23 that Leningrad II-2 has been connected to the grid. The unit is one of two Generation III+ VVER-1200 pressurized water reactors at the Leningrad nuclear plant.

The reactor will replace Leningrad I-2, a 925-MWe RBMK-1000 light-water–cooled graphite-moderated reactor that will permanently cease operation at the end of 2020 after 45 years of service. Fuel loading at Leningrad II-2 began in July, and initial criticality was achieved in August. Following the trial operation, the unit will be shut down for an additional equipment inspection by a state commission before being put into commercial operation early next year, according to Rosenergoatom.

DOE awards $18 million to support high-intensity laser facilities

October 29, 2020, 3:03PMNuclear News

The Advanced Beam Laboratory at Colorado State University will receive funding under the DOE’s LaserNetUS program.

The Department of Energy’s Office of Fusion Energy Sciences (FES) aims to accelerate U.S. research in the field of high-energy-density plasma science with the awarding of $18 million to fund operations and user support at high-intensity laser facilities in the United States and Canada, the DOE announced on October 27.

The award is part of FES’s LaserNetUS initiative, which was established in 2018 to provide U.S. scientists increased access to high-intensity laser facilities at 10 universities and national laboratories: the University of Texas at Austin, Ohio State University, Colorado State University, the University of Michigan, the University of Nebraska–Lincoln, the University of Rochester, SLAC National Accelerator Laboratory, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, and Canada’s Université du Québec.

Outgoing WNA leader: Cross bridges that divide us

October 29, 2020, 2:29PMANS Nuclear Cafe

Rising

Agneta Rising, outgoing director general of the World Nuclear Association, wrote in an October 27 World Nuclear News article that nuclear power is an essential part of the climate change solution, even if it is not part of the conversation in the European Union. “In many ways, the future of nuclear energy is much brighter than it has been for many years. We are evermore recognized and valued for the unique services that nuclear energy offers humanity, and I am immensely proud to have served and led our industry through these exciting times," said Rising in a farewell message that recapped her time as WNA director general.

Advanced reactor marketplace

October 29, 2020, 10:35AMNuclear News

Advanced reactor developers see potential markets for reactors in a range of sizes that offer clean, reliable, flexible, and cost-competitive power. Many have reached agreements with suppliers, utilities, and others to support the demonstration and possible deployment of their designs. Nuclear News is following these activities. Read on for updates and check back with Newswire often for more on the Advanced Reactor Marketplace.

Canada has invested Can$20 million in Terrestrial Energy’s 195-MW Integral Molten Salt Reactor through the Ministry of Innovation, Science and Industry, the company announced on October 15. In accepting the investment, Terrestrial Energy, which is based in Oakville, Ontario, has committed to creating and maintaining 186 jobs and creating 52 co-op positions nationally. In addition, Terrestrial Energy is spending at least $91.5 million on research and development. According to the company, the funds will assist with the completion of a key pre-licensing milestone with the Canadian Nuclear Safety Commission.

Two days earlier, Terrestrial Energy USA and Centrus Energy announced that they had signed a memorandum of understanding to evaluate the logistical, regulatory, and transportation requirements to establish a fuel supply for Integral Molten Salt Reactor power plants, which would use standard-assay low-enriched uranium at an enrichment level less than 5 percent.

NASA and DOE sign MOU on interplanetary nuclear propulsion

October 28, 2020, 12:09PMNuclear News

A “visionary view” of a nuclear thermal propulsion–enabled spacecraft mission. Image: NASA

Secretary of Energy Dan Brouillette and NASA Administrator Jim Bridenstine on October 20 signed a memorandum of understanding to continue decades of partnership between the Department of Energy and NASA and to support the goals of NASA’s Artemis program. These include landing the first woman and the next man on the moon by 2024 and establishing sustainable lunar exploration—using nuclear propulsion systems—by the end of the decade to prepare for the first human mission to Mars.

Vogtle project team reports delays, holds to approved start dates

October 28, 2020, 9:46AMNuclear News

In testimony filed last week with the Georgia Public Service Commission, Georgia Power and Southern Nuclear acknowledge that the “aggressive” target dates set in July for some of the Vogtle construction project’s upcoming milestones have had to be pushed back by a few months. At the same time, however, the companies continue to express confidence in being able to meet the regulatory-approved commercial start dates for the new reactors—November 2021 for Unit 3 and November 2022 for Unit 4.

The testimony was filed in support of Georgia Power’s Twenty-third Semi-annual Vogtle Construction Monitoring Report, released in August, which covers the period from January 1 to June 30, 2020.