Nuclear News on the Newswire

Christmas Night

Twas the night before Christmas when all through the house
No electrons were flowing through even my mouse.

All devices were plugged in by the chimney with care
With the hope that St. Nikola Tesla would share.

Go to Article

Manufacturing contracts awarded for TerraPower’s Natrium SMR

TerraPower announced this week that it has awarded the major manufacturing contracts for its Natrium plant reactor enclosure system.

These vendor awards help advance deployment and commercialization of what the company is calling “America’s first advanced reactor,” according to TerraPower’s press release. The news is also a major milestone in establishing the advanced nuclear supply chain, the company added.

Go to Article

Modeling the change: Commissioner Wright leads by example as the NRC faces its future

David Wright

There is a modern-day parable that NRC commissioner David Wright likes to reflect on from time to time, the story of a janitor on a mission. On a visit to NASA in the 1960s, or so the story goes, amid all the action and excitement and VIPs, President Kennedy stopped a janitor who was pushing his broom down the hallway. Kennedy asked the man what he was doing and he said, “Well, I’m putting a man on the moon.”

Wright believes people—all the people—are how jobs get done. And the people of the Nuclear Regulatory Commission have a very big job ahead of them. Whether it is meeting the requirements of the ADVANCE Act, bringing 10 CFR Part 53 closer to the finish line, or working with its counterparts in other countries toward climate goals and international agreements, the NRC is moving mountains, one sweep of the broom at a time.

Go to Article

Remembering the Savannah River Plant

In 1989, the Savannah River Plant was renamed the Savannah River Site. It was originally established in 1950 near Aiken, S.C., to produce nuclear materials for the nation, primarily for defense purposes. The site consisted of a heavy water production plant, three fuel fabrication facilities, five production reactors, two nuclear separation facilities, waste management facilities, tritium processing facilities, and the Savannah River National Laboratory. The main isotopes produced were, by priority, tritium, plutonium-238, and plutonium-239.

Go to Article