The pilot-scale Combined Electrolysis Catalytic Exchange (CECE) system developed at the U. S. Department of Energy's Mound facility has evolved into a fully operational tritium recovery system. This has resulted from the evaluation of recent developments in AECL/CRNL hydrophobic exchange catalyst in the CECE system. Data obtained during recent tests led to the design and installation of an aqueous tritium recovery facility. Operation of the Tritium Aqueous Waste Recovery System makes possible the recovery of tritium from low-level tritiated aqueous waste streams.