Alaska bill would simplify microreactor siting: Here’s what you need to know

February 2, 2022, 6:59AMNuclear News
This image is described by the Alaska Center for Energy and Power as a conceptual layout of a generic small modular reactor or microreactor. (Image: ACEP)

Alaska Gov. Mike Dunleavy (R.) introduced “An act relating to microreactors” (SB 177) in the Alaska state legislature on February 1 that would modify existing state law on nuclear energy by specifying that microreactors are not subject to certain nuclear reactor siting and permitting regulations in Alaska. The bill defines a microreactor as an advanced nuclear fission reactor that would be capable of generating no more than 50 MWe.

TerraPower seeks fast reactor data through time-tested U.S.-Japan research ties

February 1, 2022, 3:02PMNuclear News
A rendering of the Natrium plant. (Image: TerraPower)

Natrium, a 345-MWe sodium fast reactor with a molten salt energy storage system, was developed by TerraPower and GE Hitachi Nuclear Energy. TerraPower is planning to build the first Natrium demonstration reactor by 2028 with 50-50 cost-shared funding of about $2 billion from the Department of Energy’s Advanced Reactor Demonstration Program. And for the requisite data and testing of reactor components to support that deployment, TerraPower is looking to Japan—a country with decades of experience developing sodium fast reactor designs and testing infrastructure.

Nuclear Fuel Performance Life Cycle Modeling with the End in Mind

February 1, 2022, 12:01PMSponsored ContentJoe Rashid, Senior Associate at Structural Integrity Associates, Inc.
The cladding hoop stress distribution at cladding surfaces.

Decades of fuel performance data coupled with advanced analytics and multi-processor computing have enabled the development of ‘novel’ modeling & simulation tools that allow nuclear fuel engineers to predict behavior across the entire fuel cycle. With this new capability nuclear fuel designers and fuel reload managers are better equipped to predict performance and reliability. These tools are fundamental to communicating highfidelity safety margin assessments with the regulator, and, when applied in the early stage of reactor design, can achieve optimum safety system functionality. At the apex of the fuel performance codes development pyramid sit a triad of codes: SI’s Pegasus, DOE’s Bison, and CEA’s Alcyone, which share the commonality of three-dimensional modeling and simulation of nuclear fuel performance. Unique among the capabilities represented by these codes is the ability to bridge the encoded-technology gap between the frontend and the backend of the fuel cycle to eliminate sources of uncertainties in spent fuel safety evaluations. This capability is a distinguishing feature of the Pegasus code.

Entergy Nuclear's grants benefit neighboring communities

February 1, 2022, 9:30AMANS Nuclear Cafe

In 2021, Entergy Nuclear provided dozens of grants, totaling $415,527, to nonprofit agencies in communities where Entergy’s nuclear plants operate, as well as its headquarters in Jackson, Miss. Overall, grants were awarded in Arkansas, Louisiana, Mississippi, and Michigan, the company announced on January 31.

The grant program administered through the nuclear plants focuses on funding education, literacy, healthy families, arts and culture, and other community improvement initiatives.

Share:

U.K. launches new radioactive waste management organization

February 1, 2022, 7:35AMRadwaste Solutions

The government of the United Kingdom on January 31 announced the launch of Nuclear Waste Services. The new organization brings together site operator Low Level Waste Repository Limited, geological disposal facility developer Radioactive Waste Management Limited, and the Nuclear Decommissioning Authority’s (NDA) Integrated Waste Management Program.

According to the U.K. government, Nuclear Waste Services will maintain current commitments to the Low-Level Waste Repository in West Cumbria, the geological disposal facility program, and the communities involved with both, while also creating a business with the capability to manage U.K. nuclear waste “safely and securely for generations to come.”

NNSA’s NEST team prepares for Super Bowl

January 31, 2022, 3:01PMNuclear News

Los Angeles residents may see low-altitude aircraft near the sites of Super Bowl LVI activities on February 1 and 2. That’s when the Department of Energy’s National Nuclear Security Administration will send a Nuclear Emergency Support Team (NEST) helicopter to measure expected background radiation as part of standard preparations to protect public health and safety for the National Football League’s biggest game.

More information and video footage of NEST’s work is available online.

Vogtle’s Unit 3 in-service date on target for this year

January 31, 2022, 12:00PMANS Nuclear Cafe
In a photo from November 2021, the Vogtle plant’s Unit 4 is in the foreground, and Unit 3 is in the center. Units 1 and 2, which entered service in the 1980s, are shown at the top of the photo. (Photo: Georgia Power)

A spokesperson for Georgia Power has confirmed that the projected in-service date for the new Vogtle-3 reactor remains the third quarter of 2022, according to an article published on January 27 on the Power magazine website. The in-service date for Vogtle-4 is targeted for the second quarter of 2023, the spokesperson said.

Agreement reached on cleanup of 25-mile Savannah River Site stream corridor

January 31, 2022, 9:30AMRadwaste Solutions
An SRNS subcontractor technician takes radiological readings of soil near Lower Three Runs, part of a major project to complete the cleanup of a contaminated 25-mile-long stream corridor at SRS. (Photo: DOE) (CLICK TO SEE FULL PHOTO)

Savannah River Nuclear Solutions (SRNS), the Department of Energy’s management and operating contractor for the Savannah River Site in South Carolina, has reached an agreement with the state of South Carolina and federal environmental regulators on the final cleanup of a 25-mile-long stream corridor at the site that was radiologically contaminated as a result of operations during the Cold War.

The corridor consists of Par Pond, nine miles of canals adjacent to the pond, and a stream named Lower Three Runs. The stream begins near the center of the site, just above Par Pond, and winds its way southward across SRS.

Vogtle-2 to test Westinghouse fuel enriched to 6 percent

January 31, 2022, 7:00AMNuclear News
ADOPT fuel pellets developed by Westinghouse through the DOE's Accident Tolerant Fuel Program. (Photo: Westinghouse)

Westinghouse Electric Company and Southern Nuclear have agreed to a plan to install four Westinghouse lead test assemblies in Vogtle-2, a 1,169-MWe pressurized water reactor located in Waynesboro, Ga. Four lead test assemblies containing uranium enriched up to 6 percent U-235 will be loaded in Vogtle-2 in 2023, marking the first time that fuel rods with uranium enriched above 5 percent U-235 are put in use in a U.S. commercial power reactor.

Advanced reactors: Now comes the hard part

January 28, 2022, 2:26PMNuclear NewsMatthew L. Wald

Designing a reactor is complicated but building one may be harder. Even companies that have had lots of practice haven’t always done it well. And all the power reactors in service today were built by companies that had years of experience in other kinds of big steam-electric power plants. In contrast, some of the creative new designs now moving toward commercialization come from start-ups that have never built anything at all. How should they prepare?

NRC issues $50,000 fine for security-related violations at Oyster Creek

January 28, 2022, 12:01PMNuclear News
HDI was issued a confirmatory order by the NRC for regulatory violations at Oyster Creek. (Photo: Exelon)

The Nuclear Regulatory Commission has issued a confirmatory order to Holtec Decommissioning International (HDI) following an alternative dispute resolution mediation session regarding security-related violations at the Oyster Creek nuclear power plant in Lacey Township, N.J. A subsidiary of Holtec International, HDI is decommissioning Oyster Creek, which permanently ceased operations in 2018.

Machine learning and environmental remediation

January 28, 2022, 9:29AMANS Nuclear CafeAndrew Amann

Due to the large amount of water used by nuclear power plants, measuring the water’s impact on the environment is a huge data processing task. It is impossible to manually measure millions of gallons, along with tracking wildlife and the weather. The data computation needed to understand environmental patterns takes massive amounts of storage and strong algorithms to uncover anomalies.

Savannah River employees honored with Secretary of Energy Achievement Awards

January 28, 2022, 7:00AMRadwaste Solutions
A cask of HEU arrives at the H Canyon facility. (Photo: DOE)

The Department of Energy announced yesterday that Secretary of Energy Achievement Awards were presented to a team of Savannah River Site employees for the completion of the multiyear Target Residue Material (TRM) campaign to support global nuclear security goals.

SRS is a 310-square-mile site located in South Carolina. It encompasses parts of Aiken, Barnwell, and Allendale counties and is bordered on the west by the Savannah River and the state of Georgia.

Burning plasma state achieved at Lawrence Livermore Lab

January 27, 2022, 3:00PMNuclear News
An illustration of the two inertial confinement fusion designs reaching the burning plasma regime, as published in a recent article in Nature. (Image: LLNL)

One of the last remaining milestones in fusion research before attaining ignition and self-sustaining energy production is creating a burning plasma, where the fusion reactions themselves are the primary source of heating in the plasma. A paper published in the journal Nature on January 26 describes recent experiments at Lawrence Livermore National Laboratory’s National Ignition Facility (NIF) that have achieved a burning plasma state.

DOE notes progress in campaign to transfer radioactive capsules to dry storage at Hanford Site

January 27, 2022, 12:03PMRadwaste Solutions
Workers recently installed manipulator equipment at a full-scale mock-up of areas of the Hanford Site’s Waste Encapsulation and Storage Facility. (Photo: DOE)

The Department of Energy’s Office of Environmental Management (EM) announced this week that preparations are well underway for the transfer of nearly 2,000 highly radioactive cesium and strontium capsules from the Waste Encapsulation and Storage Facility (WESF) to interim dry storage at the Hanford Site near Richland, Wash.

Spent fuel reprocessing, or "Don't bother us with facts; our minds are made up."

January 27, 2022, 9:30AMANS Nuclear Cafe
The cover of the May 1977 issue of Nuclear News (left), an image of the story discussing Carter's decision to cancel the breeder reactor program (center) and the cover of the June 1977 Nuclear News (right).

The ANS Fuel Cycle and Waste Management Division will present a webinar today at noon EST (the recording will be available via the webinar archive to all ANS members) featuring an international panel of experts on nuclear waste reprocessing. The panel will explore the idea of separating certain radionuclides from waste using recycling technology that enables pure materials to be used for other purposes.

Bruce Power completes installation of Lu-177 production system

January 27, 2022, 7:00AMNuclear News
Bruce nuclear power plant in Ontario, Canada. (Photo: Bruce Power)

Bruce Power and Isogen, a partnership between Kinectrics and Framatome, have completed the installation of Isogen’s isotope production system (IPS) at Unit 7 of Bruce’s CANDU nuclear power plant in Ontario, Canada, making it the first power reactor in the world with installed capability to produce lutetium-177.

Nominations being accepted for 2022 ANS Annual Meeting awards

January 26, 2022, 9:30AMANS News

For more than 50 years, the ANS Honors and Awards Program has recognized outstanding achievements and meritorious service in the various fields served by the American Nuclear Society.

The recipients of the national awards listed below will be honored on June 13 during the opening plenary session of the 2022 ANS Annual Meeting. Honorees will be notified of their selection by May.

All members are encouraged to review the nomination requirements for these awards and consider nominating a qualified colleague. Many ANS awards are open to non-ANS members, and nominating colleagues who are not members is one way to foster new ANS relationships.

NRC commissioners vote to continue ISFSI security rulemaking

January 26, 2022, 7:22AMRadwaste Solutions

The Nuclear Regulatory Commission will continue work on a new rule on security requirements for independent spent fuel storage installations (ISFSIs), with two of the agency’s three commissioners voting to disapprove a request by NRC staff to discontinue the proposed rulemaking. The commissioners’ votes on the request were recorded on August 4, 2021, but were not made public until January 24.