Nuclear News

Published since 1959, Nuclear News is recognized worldwide as the flagship trade publication for the nuclear community. News reports cover plant operations, maintenance and security; policy and legislation; international developments; waste management and fuel; and business and contract award news.


IAEA kicks off annual meeting in Vienna

September 22, 2020, 12:00PMNuclear News

IAEA General Director Rafael Mariano Grossi speaks to socially distanced attendees at the agency’s 64th General Conference plenary session on September 21. Photo: D. Calma/IAEA

With special precautions in place due to the COVID-19 pandemic, the International Atomic Energy Agency commenced its week-long 64th General Conference yesterday with a plenary session that included remarks from Rafael Mariano Grossi, the agency’s director general.

“The latest IAEA annual projections show that nuclear power will continue to play a key role in the world’s low-carbon energy mix, with global nuclear electrical capacity seen nearly doubling by 2050 in our high-case scenario,” Grossi said, referring to a recently released agency report. “Climate change mitigation remains a key potential driver for maintaining and expanding the use of nuclear power.”

The IAEA conference runs through September 25.

The NRC’s Operations Center: Exercising authority to respond

September 21, 2020, 9:36AMNuclear NewsSusan Gallier

One essential lesson from the events at Three Mile Island-2 in March 1979 can be summed up in three words: Preparedness takes practice. The emergency response capacity of the Nuclear Regulatory Commission and nuclear plant operators is more than just a set of procedures. Active training and evaluation are required to coordinate effectively with local and state authorities and protect the public in the event of an off-site radiological release.

The NRC’s emergency preparedness and incident response teams work in the Office of Nuclear Security and Incident Response (NSIR) to support licensees’ mandated emergency preparedness programs. The Operations Center at NRC headquarters is staffed around-the-clock with NSIR officers who can respond to technical questions and evaluate licensee event reports, yet most of its infrastructure typically stands vacant, awaiting activation for an incident or a planned exercise. With full activation of the NRC’s incident response program, the Operations Center comes to life, and teams of staff populate workstations. That process is regularly tested during exercises that involve NRC licensees, state and local responders, and similar incident response centers at each of the NRC’s four regional offices.

No two exercises are the same. Not only is every exercise dependent on variable human performance and every plant located in a unique community, but emergency preparedness benchmarks continually evolve with advancements in technologies and procedures.

Aging management at Ringhals-3 has improved

September 21, 2020, 7:00AMNuclear News

A team of experts from the International Atomic Energy Agency have completed a review of the long-term operational safety of Unit 3 at Sweden’s Ringhals nuclear power plant, noting substantial improvements from a previous agency visit in 2018.

The review, which had been requested by the Swedish Radiation Safety Authority (SSM), the Nordic nation’s nuclear regulator, wrapped up September 18.

According to the IAEA, the Safety Aspects of Long Term Operation (SALTO) team focused on aspects essential to the safe long-term operation (LTO) of Unit 3—a 1,062-MWe three-loop pressurized water reactor that entered commercial operation in September 1981. (Ringhals houses two additional operating reactors: Unit 1, an 881-MWe boiling water reactor that began operation in January 1976, and Unit 4, an 1,102-MWe PWR that started up in November 1983. Another unit, Ringhals-2, was permanently shut down at the end of last year.)

The original design lifetime of Unit 3 will expire next year, but Vattenfall AB, the plant operator, is planning to extend operation for a total operational lifetime of 60 years.

NRC to hold webinars in October on used fuel storage facility in Texas

September 18, 2020, 11:54AMNuclear News

The Nuclear Regulatory Commission has scheduled four webinars in October to present its draft environmental findings and receive comments on Interim Storage Partners’ (ISP) proposed consolidated interim storage facility for used nuclear fuel in Andrews County, Texas.

Information for the webinars will be posted on the NRC’s Public Meetings webpage. The webinars will be held at different times of the day to maximize opportunities for the public to participate and are tentatively scheduled for the following (all times are Eastern):

  • October 1, 6 p.m. – 9 p.m.
  • October 6, 2 p.m. – 5 p.m.
  • October 8, 6 p.m. – 9 p.m.
  • October 15, 11 a.m. – 2 p.m.

IAEA: Nuclear to continue to play key role in low-carbon energy production

September 18, 2020, 10:02AMNuclear News

The International Atomic Energy Agency has just released its latest projections for energy, electricity, and nuclear power trends over the next 30 years. Compared with the previous year, the new projections are largely unchanged.

In the report's high-case scenario, the IAEA expects a rise in global nuclear electrical generating capacity of 82 percent, to 715 gigawatts. In the low-case scenario, that capacity is expected to drop 7 percent, to 363 gigawatts.

The report is titled Energy, Electricity and Nuclear Power Estimates for the Period up to 2050.

HALEU investment is key part of TerraPower’s demo proposal

September 17, 2020, 2:58PMNuclear News

TerraPower announced on September 15 that it plans to work with Centrus Energy to establish commercial-scale production facilities for the high-assay, low-enriched uranium (HALEU) needed to fuel many advanced reactor designs.

The proposed investment in HALEU fuel fabrication is tied to a TerraPower-led submittal to the Department of Energy’s Advanced Reactor Demonstration Program (ARDP), which was created to support the deployment of two first-of-a-kind advanced reactor designs within five to seven years. TerraPower would like one of those designs to be Natrium, the 345-MWe sodium fast reactor that it has developed with GE Hitachi Nuclear Energy.

ECA launches “new nuclear” initiative

September 17, 2020, 9:28AMNuclear News

The board of directors of the Energy Communities Alliance (ECA), an organization known more for its work in advancing the cleanup of Department of Energy sites, is launching a new initiative aimed at supporting the development of new nuclear technologies. As announced by the ECA on September 15, the self-funded, one-year initiative will focus on small modular reactors, micro and advanced reactors, a skilled nuclear workforce, and new nuclear missions around DOE facilities. facilities.

“With growing bipartisan support for nuclear energy in Congress, new federal demonstration projects led by DOE and the Department of Defense, and notable investment from the private sector, local governments want to be meaningfully engaged—and prepared—to match the strengths and needs of our communities with new nuclear opportunities,” the ECA said in its announcement.

New report explores value of flexible nuclear energy in clean energy systems

September 17, 2020, 6:59AMNuclear News

A report just released from the Clean Energy Ministerial’s (CEM) Nuclear Innovation: Clean Energy (NICE) Future initiative examines the potential roles that flexible nuclear energy generation can play in both current and future clean energy systems.

A product of the initiative’s Flexible Nuclear Campaign for Nuclear-Renewables Integration, the 154-page report, Flexible Nuclear Energy for Clean Energy Systems, includes the views of experts from government agencies, ministries, and industry organizations across the globe.

The report uses the term “flexibility” to mean the ability of an energy source to economically provide services when and where they are needed by end users. Energy services can include both electric and nonelectric applications using both traditional and advanced nuclear power plants and integrated systems, according to the report.

Hitachi pulls plug on Wales nuclear build project

September 16, 2020, 3:00PMNuclear News

Artist's concept of the Wylfa Newydd project. Image: Horizon Nuclear Power

Tokyo-based Hitachi Ltd. today announced that it is withdrawing from the currently suspended Wylfa Newydd nuclear-build project in northwestern Wales. The announcement dashes the hopes raised last month by reports that Horizon Nuclear Power, the Hitachi subsidiary in charge of the project, was in talks with the U.K. government regarding a possible resuscitation.

Hitachi had put the project on hold some 20 months ago, and in today’s announcement the company cited the length of the suspension and the COVID-19 investment environment as factors in its decision.

Department of Commerce, Rosatom sign draft amendment to uranium agreement

September 15, 2020, 12:03PMNuclear News

The U.S. Department of Commerce and Rosatom on September 12 initialed a draft amendment extend the Agreement Suspending the Antidumping Investigation on Uranium from the Russian Federation, signed in 1992. Rosatom is Russia’s state atomic energy corporation.

Should the amendment receive final approval, it will extend the agreement to 2040.

ASLB adds conditions to Seabrook license amendment

September 15, 2020, 7:03AMNuclear News

An ASLB calls for closer scrutiny of concrete degradation at Seabrook.

An Atomic Safety and Licensing Board has rendered its decision on a challenge to a license amendment concerning concrete degradation—known as alkali-silica reaction, or ASR—at the Seabrook nuclear power plant, upholding the amendment but imposing four additional conditions. The board found the new conditions to be necessary to provide adequate protection of public health and safety, according to a September 11 Nuclear Regulatory Commission press release. (The ASLB is the NRC’s independent body charged with conducting adjudicatory hearings and deciding legal challenges to the agency’s licensing and enforcement actions.)

The challenge to NextEra Energy’s license amendment for Seabrook was brought in 2017 by the C-10 Research and Education Foundation, an opponent of license renewal for the New Hampshire facility, which houses one 1,248-MWe four-loop pressurized water reactor.

Special committee holds first hearing on H.B. 6

September 14, 2020, 3:01PMNuclear News

Some two weeks after its creation, the Ohio House Select Committee on Energy Policy and Oversight held its first hearing on September 10 to consider a potential repeal of the Ohio Clean Air Program Act (H.B. 6).

H.B. 6 is the sweeping energy law that includes subsidies for the state’s two nuclear power plants, Davis-Besse and Perry, and that is currently at the center of an alleged $61-million corruption scheme aimed at guaranteeing its passage.

Newly elected Ohio House Speaker Bob Cupp (R., Dist. 4)—who replaced Rep. Larry Householder (R., Dist. 72) as speaker following the latter’s July 21 arrest as the scheme’s alleged ringleader—announced the committee’s creation in late August. Cupp stated that its goal is “repealing House Bill 6 and replacing it with thoughtful legislation Ohioans can have confidence in.”

The committee’s initial hearing, however, focused only on efforts to immediately repeal the measure. Proponents of two repeal bills—one backed by Republicans (H.B. 746) and one by Democrats (H.B. 738)—argued their positions, with some displaying greater rhetorical gifts than others.

Harnessing the promise of radiation: The art of reasonableness

September 11, 2020, 3:04PMNuclear NewsPaul Locke, Amir Bahadori, Antone Brooks, Shaheen Dewji, Mary Lou Dunzik-Gougar, Marilyn Kray, and Alan Waltar

Radiation has benefited mankind in many ways, including its use as an energy source and an indispensable tool in medicine. Since the turn of the 20th century, society has sought ways to harness its potential, while at the same time recognizing that radiological exposures need to be carefully controlled. Out of these efforts, and the work of many dedicated professionals, the principles of justification, optimization, and limitation have emerged as guiding concepts.

Justification means that the use of radiation, from any radiation source, must do more good than harm. The concept of optimization calls for the use of radiation at a level that is as low as reasonably achievable (ALARA). Dose constraints, or limitation, are meant to assist in reaching optimization and protection against harm by setting recommended numerical levels of radiation exposure from a particular source or sources. Together, these three principles form the bedrock of the international radiation protection system that drives decision-­making and supports societal confidence that radiation is being used in a responsible manner.

Tianwan-5 ready for commercial operation

September 11, 2020, 9:29AMNuclear News

Unit 5 at the Tianwan nuclear plant. Photo: CNNC

Unit 5 at the Tianwan nuclear power plant completed its full-power continuous operation assessment on September 8, meeting the conditions for commercial operation, China National Nuclear Corporation reported. The domestically designed ACPR-1000 pressurized water reactor will become CNNC’s 22nd reactor to provide power to China’s electric grid, raising the CNNC fleet’s installed capacity from 19.112 million kilowatts to 20.230 million, according to the company.

Tianwan-5 construction officially commenced on December 27, 2015, with the pouring of safety-related concrete. China’s National Nuclear Safety Administration issued a 40-year operating license for the unit on July 7 of this year, and two days later CNNC announced that first fuel loading had been completed. The reactor achieved initial criticality on July 27 and connected to the grid on August 8. Once commercial operation of the unit has begun, Tianwan will boast five operating reactors.

Canada’s Darlington-3 refurbishment begins

September 11, 2020, 7:01AMNuclear News

Ontario’s Darlington nuclear power plant. Photo: OPG

The latest phase of the Darlington nuclear power plant’s refurbishment project began last week with the start of the defueling of Unit 3, according to Ontario Power Generation (OPG). Originally scheduled to begin in May this year, Unit 3’s refurbishment was postponed due to the COVID-19 pandemic.

Located in Clarington, Ontario, Canada, the Darlington plant houses four 878-MWe CANDU pressurized heavy-water reactors, all of which entered commercial operation in the early 1990s. The 10-year refurbishment project—which was 10 years in the planning—commenced in earnest in October 2016, when Unit 2 was taken off line (NN, Dec. 2016, pg. 45). The refurbished Unit 2 was returned to service in early June, and in late July Unit 3 was shut down and disconnected from the grid in preparation for its refurbishment.

GlobalData: China to pass U.S. nuclear capacity in six years

September 10, 2020, 5:03PMNuclear News

China is on track to overtake the United States in nuclear power capacity by 2026, according to GlobalData, a U.K.-based research and analytics company.

More than 160 GW of nuclear capacity will likely be added globally between 2020 and 2030, some 66 percent of which is anticipated to take place in China, India, and Russia, the company reported on September 9. China alone is set to account for more than 50 percent (83 GW) of the new capacity, followed by India with 8.9 percent (14.5 GW) and Russia with 6.4 percent (10.5 GW). GlobalData also projects that during the same period, more than 76 GW of nuclear capacity will be retired.

DOE awards $17 million for research at Princeton fusion facility

September 10, 2020, 7:00AMNuclear News

The NSTX-U “umbrella.” Photo: Elle Starkman/ PPPL Office of Communications

The Department of Energy on September 8 announced funding for research at the National Spherical Tokamak Experiment Upgrade (NSTX-U), an Office of Science user facility at the DOE’s Princeton Plasma Physics Laboratory in Princeton, N.J.

Total planned funding is $17 million for the NSTX-U work over five years in duration. As much as $6 million in fiscal year 2020 dollars and out-year funding could be available this year, contingent on congressional appropriations and satisfactory progress.

The initiative will support experiments, data analysis, and computer modeling and simulation of plasma behavior. A major focus will be on the start of laying the scientific groundwork for a next-generation facility through better understanding of the behavior of plasmas in spherical tokamaks, the DOE said.

Fuel loading begins at first Hualong One unit

September 9, 2020, 3:00PMNuclear News

Fuel loading begins at Fuqing-5. Photo: CNNC

The loading of 177 fuel assemblies into the reactor core of Unit 5 at the Fuqing nuclear power plant began on September 4, following the issuance of the unit’s operating license from China’s Ministry of Ecology and Environment, the China National Nuclear Corporation (CNNC) announced on September 8. Construction of the reactor began in May 2015.

Unit 5 will be the first of the Hualong One reactors to enter commercial operation, expected later this year if all goes according to plan. Also known as the HPR1000, the Hualong One is a 1,000-MWe Generation III pressurized water reactor, indigenous to China. Unit 5’s twin HPR1000 at Fuqing, Unit 6, is scheduled to start contributing power to the grid next year.

Located in China’s Fujian Province, Fuqing also houses four 1,000-MWe CPR-1000 PWRs, with commercial start dates of November 2014, October 2015, October 2016, and September 2017, respectively.

CNL and Kairos Power reach agreement on tritium research

September 9, 2020, 1:00PMNuclear News

Canadian Nuclear Laboratories (CNL) on September 3 announced a research collaboration agreement with Kairos Power. Funded through CNL’s Canadian Nuclear Research Initiative (CNRI), the agreement includes research and engineering for technologies to separate, analyze, and store the tritium that would be created during the operation of Kairos Power’s proposed fluoride-salt–cooled small modular reactor.

Second license renewal application filed for North Anna

September 9, 2020, 6:57AMNuclear News

North Anna nuclear power plant. Photo: Dominion Energy

Dominion Energy has filed an application with the Nuclear Regulatory Commission to renew the North Anna nuclear power plant’s reactor operating licenses for additional 20-year terms, the Richmond, Va.–based utility announced on September 4. The NRC received the application on August 24.

North Anna, located in Mineral, Va., is home to twin 973-MWe three-loop Westinghouse pressurized water reactors. The filing makes the plant the second nuclear facility in the state to seek subsequent license renewal, after Dominion's filing in 2018 of a similar application to renew the licenses of its two Surry units—twin 874-MWe reactors. The NRC is currently reviewing that application.

(Following its April 2020 meeting, the NRC’s Advisory Committee on Reactor Safeguards issued a report recommending approval of the Surry SLR applications [NN, June 2020, p. 15].)

According to Dominion, the North Anna and Surry units produce 31 percent of the electricity for the company’s 2.5 million customers and 95 percent of the carbon-free electricity in Virginia.