Nuclear News

Published since 1959, Nuclear News is recognized worldwide as the flagship trade publication for the nuclear community. News reports cover plant operations, maintenance and security; policy and legislation; international developments; waste management and fuel; and business and contract award news.


FES debuts new name following bankruptcy

March 3, 2020, 11:51AMNuclear News

FirstEnergy Solutions (FES) announced on February 27 that it has emerged from bankruptcy and officially taken the new name Energy Harbor Corporation. Originally the unregulated power generation arm of Akron, Ohio–based FirstEnergy Corporation, Energy Harbor remains headquartered in Akron but is no longer affiliated with FirstEnergy Corporation. The name chosen to represent the newly independent business was announced last November (NN, Jan. 2020, p. 16).

Recent changes to ABET accreditation criteria

March 2, 2020, 8:32AMNuclear NewsWalid A. Metwally

ABET, originally an acronym for the Accreditation Board for Engineering and Technology, is a nonprofit, nongovernmental organization that accredits college and university programs in the disciplines of applied and natural science, computing, engineering, and engineering technology. ABET accredits degrees at the associate, bachelor’s, and master’s levels. Over the years, the organization has expanded its domestic and global accreditation presence, and it currently accredits over 4,000 programs in 32 countries.


Weighing options for NextEra Energy and Summer-­2 and -­3 site

February 17, 2020, 4:40PMNuclear News

NextEra Energy announced on February 11 that its bid to buy South Carolina’s public utility, Santee Cooper, is the “recommended purchase proposal” following a formal bid invitation called for by the state’s General Assembly in May 2019 (NN, June 2019, p. 9). Competing with NextEra’s purchase offer is a reform plan put forward by Santee Cooper in an attempt to avoid a sale as the utility continues to grapple with the failed Summer-­2 and -­3 nuclear construction project and the $3.6 billion in debt incurred before the project was halted in July 2017.

A report from the South Carolina Department of Administration published on February 11 outlined the competing plans and factors that the General Assembly may want to take into consideration as it mulls the plans. A third option, a proposal by Dominion Energy to take over the management, but not the ownership, of Santee Cooper was also evaluated.

Nuclear figures in state’s clean energy future

February 17, 2020, 4:36PMNuclear News

A study released by Energy Northwest on January 30 concludes that more and different electricity sources, including nuclear, will be needed to maintain energy reliability and achieve a carbon-­free energy system in the state of Washington by 2045. The study used published conservation and efficiency projections and costs and examined the value of creating additional solar and wind facilities, as well as extending the operation of the Columbia nuclear power plant beyond 2043 and deploying small modular reactors.

“Completing this study is simply the first step in a much larger decision-­making process,” said Brad Sawatzke, Energy Northwest’s chief executive officer. “Any decision to invest in new resources will take time and will only be done in the best interest of our member utilities, the people of Washington, and, of course, the environment.”

Share:

DOE launches advanced reactor demo program

February 17, 2020, 4:32PMNuclear News

The Department of Energy was directed by the Nuclear Energy Innovation Capabilities Act of 2017 to establish the Advanced Reactor Demonstration (ARD) Program to stimulate commercial enterprises in advanced reactor deployment and facilitate U.S. private industry’s demonstration of several advanced reactors with the capability to achieve reliable, cost-­effective, and licensable designs. The ARD program was launched on February 5 with a request for information (RFI) and notice of intent (NOI) issued by the Office of Nuclear Energy’s Office of Reactor Fleet and Advanced Reactor Deployment.

Share:

First fuel loading at Vogtle Unit 3 scheduled for November

February 17, 2020, 4:11PMNuclear News

Vogtle Unit 3 (at left) is scheduled to begin operation in November 2021, one year ahead of Unit 4. Photo: Georgia Power

The Nuclear Regulatory Commission has announced an opportunity to request an adjudicatory hearing regarding Southern Nuclear’s notice of intended operation of Unit 3 at the Vogtle nuclear power plant, located in Waynesboro, Ga. The announcement was prompted by a January 13 letter from Southern Nuclear notifying the NRC of its scheduled date of November 23, 2020, for initial fuel loading at the reactor. As required under 10 CFR 52.103(a), the notification was made more than 270 days prior to the scheduled fuel load.

A combined license was issued for Vogtle-­3 and -­4, Westinghouse-­designed AP1000 pressurized water reactors, in February 2012. The license covers both construction and operation after construction is completed if standards—known as inspections, tests, analyses, and acceptance criteria (ITAAC)—identified in the combined license are satisfied. Operation will not be permitted until the NRC staff finds that all ITAACs have been met. However, if a hearing request is granted, the NRC can allow interim operation, given reasonable assurance of adequate protection of public health and safety while the adjudicatory hearing is carried out.

Share:

EIA Report: Nuclear generation to drop 8 percent by 2050

February 14, 2020, 4:50PMNuclear News

The U.S. Energy Information Administration is projecting that U.S. electricity generation from nuclear power will most likely decline from its 2019 share of about 20 percent to 12 percent by 2050. In addition, the agency sees generation from coal declining by 11 percent, from 24 percent to 13 percent.

According to the EIA’s Annual Energy Outlook 2020, released in late January, nuclear and coal will experience a substantial falloff over the next few years—the result of slow load growth and the increasing electricity production from renewables, which is expected to grow from 19 percent to 38 percent over the next 30 years—but will then plateau to collectively provide about 25 percent of the nation’s electricity through the century’s midpoint.

Tags:
Share:

Utility sets goal of net-­zero emissions by mid-­century

February 12, 2020, 4:38PMNuclear News

Referencing the findings of the Intergovernmental Panel on Climate Change, as well as its own “strong history of environmental stewardship,” Dominion Energy on February 11 announced that it is expanding its greenhouse gas emission–reduction goals by pledging to achieve net-­zero emissions by 2050. The new goal covers emissions of carbon dioxide and methane—the two leading greenhouse gases—from the company’s electricity generation and gas infrastructure operations.

“Our mandate is to provide reliable and affordable energy safely,” said Thomas F. Farrell II, Dominion’s chairman, president, and chief executive officer. “We do that every day, all year long. But we recognize that we must also continue to be a leader in combatting climate change. . . . Dominion Energy already has made important progress on emissions. This new commitment sets an even higher bar that I am confident we can, and will, reach. Net-­zero emissions will be good for all of our stakeholders—for our customers, communities, employees, and investors.”

FY 2021 DOE-NE and NRC budget proposals released

February 10, 2020, 4:19PMNuclear News

President Trump’s budget request for fiscal year 2021, released on February 10, allots $35.4 billion to the Department of Energy. Nearly $1.2 billion of that goes to the Office of Nuclear Energy (DOE-NE).

The final FY 2020 appropriations were signed into law on December 20, 2019, nine months after that budget was first proposed, and it could be several months before final appropriations for FY 2021 are enacted. Those enacted appropriations could bear little resemblance to the proposed budget. It bears noting that while the FY 2020 budget request for DOE-NE was $824 million, more than $1.493 billion—an increase of just over 87 percent—was ultimately enacted.

Looking high and low for HALEU

September 2, 2019, 10:00AMNuclear NewsSusan Gallier
The interior of the process building at the American Centrifuge Plant in Piketon, Ohio, where Centrus Energy plans to operate a HALEU demonstration cascade by June 2022. (Photo: Centrus Energy)

Advanced reactor cores are being designed for higher efficiencies and longer lifetimes, but to get there, they need high-assay low-enriched uranium (HALEU).

Enriched to between 5 and 19.75 percent fissile U-235, HALEU is packed with nuclear potential. It can be used as a feedstock for the demonstration of new fuel designs, from uranium alloys to ceramic pellets and liquid fuels. Those fuels can enable advanced reactor and microreactor demonstrations. Operating light-water reactors could potentially transition to HALEU uranium oxide fuels for extended operating cycles and improved plant economics.

Ann Winters: On the 100th anniversary of Wilkinson’s birth

August 1, 2018, 9:10AMNuclear News

Winters

Dennis Wilkinson would have celebrated his 100th birthday on August 10, 2018. The life and career of the man who captained the first nuclear-powered submarine and the first nuclear-­powered surface ship and was the first president and chief executive officer of the Institute of Nuclear Power Operations (INPO) have been captured in Ann Winters’s book, Underway on Nuclear Power: The Man Behind the Words, Eugene P. “Dennis” Wilkinson, Vice Admiral USN.

Because of his inherent drive, Wilkinson was often called a cowboy, maverick, visionary, innovator, and superb leader. As the first commanding officer of USS Nautilus, he was a major player in revolutionizing underwater warfare. Nautilus and its crew were immensely popular, at home and abroad, and in the 1950s became what we now call “rock stars.” Nautilus gave nuclear power celebrity status at a time when the United States and the world were grappling with Cold War issues.